
Shop By Use:
Shop By Application:
Shop By Industry:
|
You are here: Leach Fields
Leach Field Treatment Products from REX-BAC-T
The basic septic tank is designed to retain the solids and scum and prevent them from entering the leach field. Most septic system provide a two to four day retention time. When the volume of the tank is reduced by the build up of solids and scum, the retention time is reduced allowing higher levels of the undigested sewage travel into the leach field. This increases the demand on the leach field to break down the undigested material causing a “biomat film” to form. This biomat is an, ugly, black, anaerobic, layer that prevents the liquid from “percolation” (dispersing into the soil or evaporating through the surface). Early signs of Leach Field Failure:
Routine use of REX-BAC-T® Septic and Leach Field Products prevent the build up of the scum layer and the accumulation of sludge in your septic tank and are formulated to provide effective reduction of the fats oils grease, proteins, carbohydrates and cellulose in the wastewater reducing the load on the drain field. Our BioMat-X™ leach field cleaner is formulated to break up the biomat layer that has formed in the leach field lines. Leach Field Do’s and Don’ts
|
|||||||
| Back to Top | ||||||||